Document Broadband Expansion. GIS-Compliant. Offline-Capable.
No correct GIS documentation, no funding. EVA-Mobil ensures your documentation meets GIS regulations v4.1 – directly on the construction site, even without internet.
Regulatory Requirements for Broadband Expansion
GIS Regulations v4.1
Required for funded broadband expansion: GIS data as Shapefile, building-accurate area delineation, multiple submission dates.
DIN 18220 (Aug. 2023)
Documentation of micro-duct and fiber optic installation (trenching, milling, plowing). Recognized technical standard per §126 TKG.
ATB-BeStra (FGSV)
Technical conditions for utilities in public roads. As-built documentation of the actual state of installed utilities.
Each of the 224 funded broadband projects in Saxony MUST deliver utility documentation according to these regulations.
How EVA-Mobil Supports Your Broadband Documentation
Dual-Color Markers for Status Tracking
Color-coded markers show construction progress: Planned → In Progress → Completed → Approved. Inner color for tubes, outer color for association.
GPS-Precise Field Location
Capture routes, manholes, and building connections directly on-site with GPS coordinates. Photos are automatically georeferenced.
Offline Capture on Construction Sites
No internet on the construction site? No problem. EVA-Mobil stores all data locally and syncs automatically when connected.
Exportable Documentation
WFS export enables conversion to Shapefile format. Photos with GPS metadata document construction progress without gaps.
Status Workflows per Regulation
Defined workflows from planning to acceptance. Each status is documented with date, person, and GPS position.
Self-Hosted: No Cloud Dependency
All data stays on your own infrastructure. Important for municipal clients and funded projects.
Ready for EVA-Mobil?
See how EVA-Mobil revolutionizes your GIS workflow. Request a personal demo.
From €149/month · 14-day free trial · No credit card required
Or contact us directly: